I have my bottom end built now but its pretty much bare, the sump isn't bolted up yet, holes for pulleys haven't been drilled, water pump, oil pump, harmonic balancer etc isn't on there yet but i have everything.
I'm taking the bottom end and head to the engine builder in 3 weeks to get the holes drilled for the pulleys, get the timing belt put on and torqued up, head machined if needed and have the valves reseated if needed and get the head bolted on with the head gasket
What i basically wanna know is what should i bolt up before taking it there and what shouldn't i, was thinking not to put the sump on incase any crap gets in there. I want the engine builder to do as little as possible to save a bit of money and thats why i'm bolting up the water and oil pump etc myself but i just wanna know the order to do it all in!
cheers in advance!