Next steps I think , Include new Alcon brake kit, Oil cooler setup, Front mount and Koyo Rad back in, New Tie rods, Castor arms , suspension overhaul etc.- , Rear sub frame getting overhauled as well, New clutch, New Fuel lines being run for e85, Vipec installed, New CR KAI's, All the new pipework that was fab'd previously - reinstalled, Fuel setup in the stainless box in the boot - Surge tank + pump + lines etc, Battery in box in the boot with isolator etc, Whole hicas system coming out, Gauges installed. Possibly look at rear diff, That's as far as I can remember, Should be quite an eventful month or two! Will keep updates coming.