Jump to content
SAU Community

Recommended Posts

Hi mate,

It looks like you are ready to get your build happening!!

I alway use Ron Bell Engineering in Mandurah. They have the lastest machine in WA for balancing and the right knowlege to go with it.

I always got the right price and service.

Speak to Nathen, he will sort you out!!

Link to comment
https://www.sau.com.au/forums/topic/194340-xspeed-info/#findComment-3485963
Share on other sites

Heinz Performance Engineering5/ 26 Cohn St Carlisle 6101(08) 9470 3299

Very specific of how they do things, good work though, know a few people who have used them and all have been very happy, had them build my rb26 bottom end, yet to use it but should be finished in the next few weeks....

Link to comment
https://www.sau.com.au/forums/topic/194340-xspeed-info/#findComment-3493167
Share on other sites

Hard to beat Heinz,Streetcar#34 DR30 Skyline lasts a full season with only end of year refresh with their machine work.700fwhp at over 8000rpm on a very basic RB25 and the fastest Skyline at Wanneroo,By the way the 2nd fastest is also machined by Heinz.Small 2 man show but worth waiting for.

Edited by N I B
Link to comment
https://www.sau.com.au/forums/topic/194340-xspeed-info/#findComment-3493853
Share on other sites

  • 6 years later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • It's unfortunate what Tomei USA has done to Tomei's name in general. I'm very weary of ordering parts from them now. I only order direct from a Japanse source (e.g Nengun). At least their logos are different, so you end up knowing what you have. 
    • Update Issues 5 (plus #4) - 10 After making a claim about issue #4's missing part, DeAgostini Japan sent a whole new issue #4 and it arrived about 2 weeks after that. That was back in early March. It took another 4 weeks to receive issues 5 - 13 though. This update is for issues 5 - 10. Ove the 5 issues the front left suspension and most of the engine have been completed. The quality of the castings and fit of the parts is quite good, it seems better than DeAgostini's BNR34 Skyline GT-R from the Fast & Furious 2 movie, which (to me anyway) doesn't seem to have as tight tolerances or quite as accurate castings.  Each issue has a lot of info about the 1989 - 1993 Skyline range and other Nissan models from that era, but the focus is on the BNR32 Skyline GT-R Nismo and the various racing it did in Japan, Europe (Spa 24hrs) and of course Australia. I've included some text translated with Google Lens in some photos and will add to them if there's anything worth including. 
    • If it's for a SR20, make sure it's not the American Poncams, might as well call them Poocams. Had a set in a friend's car, all scuffed up after a few track days. Like the metallurgy Tomei USA used is junk. Went back to JDM OG Tomei Poncams, no issues till now.   Tomei USA is not the real OG Tomei.   Random rant over, fk the US of A, bunch of c u n t s. 
    • Most of the industry in North America either runs on Siemens or Allen Bradley. I have two redundant S7-1500's on my desk right next to me for simulation. Siemens has been losing ground though since Stuxnet, as cybersecurity is a big thing. In my line of work that is federally regulated, you must by law have a cybersecurity management program in place and its audited and inspected every so often.  I work with Emerson PLC's daily (RX3i's) and have done large biogas/refinery projects with their DCS's. Their PLC's are somewhat OK minus the way they do PLC redundancy (You have to download on both PLC's separately every time you make a change )  As for their DCS's... you'll be limited financially first before anything else stops you. Costs are exorbiant at roughly 10x what it would cost you to do with any other system (e.g AB PAC).  1990's, those suckers are brand new haha! Kraft-Heinz (An old client when I use to work for an ESP) still runs Siemens TI505 PLC's from the mid 80's. Ohh how I don't miss working with those... you could only do a certain number of online downloads until it's "Change" buffer would be full and you would then need to go offline to do a full download. There was no warning of when this was coming up and it generally would happen when you would go in at 2am to make changes before production -_-.     
×
×
  • Create New...