Jump to content
SAU Community

Recommended Posts

Hello, im organising a snow trip for a day!

Here are the details if anyone may be keen :D:

DATE: Saturday 19th JULY

Departure Time from Melbourne: 6.00am

Arrival Time at Mt Buller: 10.00am

Departure Time from Mt Buller: 4.00pm

Arrival Time at Melbourne: 9.00pm

Here is the bus company:

http://www.victouring.com.au/

Price Per Person for Bus Fare: $30.00

Price Per Person for Mt Buller Entrance: $12.00

The bus is a 50 passenger seater, so pass the word onto your friends!

I was thinking if we all meet at watergardens shopping center and get picked up there coz the car parks big enough for everyone to park. Adress for Water Gardens is 399 Melton Highway, Taylors Lakes. Melways reference Map 3, E12

On our way up, there is place called the ALZBURG RESORT, where we will stop and be able to hire Tobbogans, Clothes, Ski's and whatever else you will want to hire.

Here is the Price list for each item:

http://www.alzburg.com.au/ski_hire.asp

If you are interested, I will need your $30.00 bus fare before hand and you pay your $12.00 entry fee when we arrive. I think I have pretty much covered everything, but if you have any other questions please let me kno :D

CONFIRMED 100%:

1 - DNGRUS

2 - Memz

3 - Osman

4 - Commando

5 - bLaQ.bOi

Iv spoken to the bus company, the NEW plan is as follows:

Departure Time from CHADSTONE SHOPPING CENTRE for the East people: 5.30am

Bus heads towards WATERGARDENS SHOPPING CENTRE for west people

Departure Time from WATERGARDENS SHOPPING CENTRE: 6.30am

Bus heads towards Mt Buller

Arrival Time at Mt Buller: 10.30am

Departure Time from Mt Buller: 4.30pm

Arrival Time at Melbourne: 9.00pm

(CANT EDIT THIS INTO THE 1st POST FOR SOME REASON, CAN OF THE MODS PLZ DO IT FOR ME)

  • 2 weeks later...

hey htere dngrus ill be in but im not sure on wat i have to bring itll be me and 4 other ppl wit me if thats ok i neva been to the snow so it shoiuld be good and confirmation of bus details would be a great help please see use all there. Do i give u bus fare before the day or giv in the morning?

Edited by voox
Guest
This topic is now closed to further replies.


  • Similar Content

  • Latest Posts

    • It only looks tidy, as most of the stuff that was on the whole back wall, is now in the trailer to go to the tip, or has been shoved in my 2.2x2.4m "Spare parts room", and now I can't get to anything in there Ha ha ha I could definitely do with a bit more space, but I'd just end up with your problems I'm going to enclose the car port beside the garage, and move a lot of stuff into it I think. OR... It will be setup as a fabrication area, and the main garage will have parts storage in it. I'm not sure yet... Need some pictures of that big shed you've got with the bikes and Skyline in
    • No. I think it's gone. 😭 I think you can get body coloured ones on eBay so I think I'll get one of those... Or just hang a red ribbon from the hole and whack a TOW sticker next to it.
    • Can't say I've had a bad experience with one on my car, then again it only gets washed once or twice a year... The wheels on the other hand, get a good spray often due to my shitty dusty pads.
    • @MBS206 thats pretty neat and tidy to me!  I'll get a photo of mine when I'm out there next. It might require multiple photos to understand the scale of the atrocities though... In total I have 4 sheds of varying sizes and layouts. Main shed is 14x8, second shed is 3x8, third shed is 11x2.5, fourth shed is around 6x4.  All are pretty much full.   The main goal of my cleaning tsunami is to make the main shed predominantly car and motorbikes only. Second shed is my metal fab room (2 x bench grinders, drill press, bench belt sander, metal band saw, scrap metal storage and some of my garden tools.  3rd shed is more bigger garden stuff, storage for engine crane, jack stands, concrete grinder, concrete mixer, air compressor lives there, and it now has two 2mx2m pallet racking shelves with itemised boxes holding building stuff, electrical stuff, plumbing stuff, etc, etc.  The 4th shed is Ryobi electric ride on mower, mini boom sprayer, ancient Kubota tractor, more garden stuff!  I have got a lot of shit....  Then there's the pool house (8mx4m) and the pool pump shed (4mx4m).  I built all of the sheds over the 11 years we've been here.  The main shed was a Ranbuild kit, the rest are all custom made to fit the areas available. Building the main shed taught me a LOT as I had no idea about building anything prior to that!  I've still got one more in me. It will be my man cave which I poured the extra concrete for way back when I poured the concrete for the main shed. The idea is the Skyline will be a centre piece of the main cave once (if...) it's finished.  I told my now 14 year old son yesterday that I will 100% drive him to his year 10 formal in 2 years. Still a long way off but at least I now have a date to work towards! 🤣
    • Modern oils are amazing. Add tyres to that as well.
×
×
  • Create New...