Jump to content
SAU Community

Recommended Posts

Hey guys just about to pick up some wheels for my 34 and as they are interstate i dont want to have to buy them to find out they will be a shit fit.

Now the sizes and offsets are-

Fronts: 18 x 8 +31

Rears: 18 x 9 +37

Now i just need a answer, because i have been getting mixed reactions/comments saying that they wont fill my guards properly.

Also running tanabe coilovers all round.

Cheers Guys.

Link to comment
https://www.sau.com.au/forums/topic/237350-ssr-professors-sp-1s-on-34-gtt/
Share on other sites

Give 'n15m0' a PM. He's a wheel whore from the sounds of things ( :( ) and he used to run professors' too. Give him a PM and he should be able to get back to you with his experiences on which wheels will fit and what's needed for them to fit.

Give 'n15m0' a PM. He's a wheel whore from the sounds of things ( :ninja: ) and he used to run professors' too. Give him a PM and he should be able to get back to you with his experiences on which wheels will fit and what's needed for them to fit.

cheers will do..

Also if anyone has photos of wheels that are:

18 x 9 +24, 18 x 10 +37

On there 34, please post a picture and any info?? Did you need to do any guard work etc?

Fronts: 18 x 8 +31

Rears: 18 x 9 +37

will fit fine, you dont have to worry about rolling guards etc

I used to have works meister s2rs which were 18x9 +28 offset and they sat nicely, no rubbing whatsoever

Even with the "18 x 9 +24, 18 x 10 +37", that should fill the guards nicely, but with +24 up front you may get some rubbing on full lock

Edited by R34GTFOUR

yeah i think im going to pick up the 18 x 9 +24, 18 x 10 +37,

I knew 18" 8x9 would fit, but just not fill my guards properly.

If anyone has pics of 18 x 9 +24, 18 x 10 +37 would be good..

19's are overkill imho too

18's = good tyres and with the right size and offset FILL the guards nicely

i run 18x8.5+30 and 18x9.5+30 ssr sp1's and needed to roll the rear guards a lil... but not much at all :P

Hey bud, We have a set of work emotion XT7 in stock at the moment in white 18x8.5 +25 and 18x9.5 +17. Normal retail is $2250 + postage but I can do them for $2050+ postage as we are trying to clear some room for new stock etc. If you want other rims we can order them for you aswell.

Ryan

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • Hi guys my 94 r33 gtst fuel pump has gone out. I have a walbro 525 ready to go in but am unsure if I need to upgrade the fuel tank bulk heads? Ive heard that others have issues with the stock wiring melting... Ive seen alot of people recommend this: https://frenchysperformancegarage.com/products/fpg-nissan-skyline-r33-r34-silvia-s14-s15-billet-fuel-tank-bulkhead-hat-top-an6-with-high-current-connector-apex-2-8-delphi-fpg-100?variant=42873255198898 My current pump that stopped working is aftermarket but I had no relay mod or upgraded connectors. Need some advice please. TIA
    • It’s new. It’s the cd009. I did take the transmission apart to mill down the bellhousing and had both housings come off the gears so wondering is something isn’t in right. I am running redline. I can get it in gear running too but it’s just not easier and it’s almost like 2, 4, 6, and reverse all the back gears aren’t happy going in
    • I’ll remember that as a last choice. It’s brand new
    • Got keys and did a walk around the yard planning the landscaping works with the family that I will be doing Main effort: remove all the woodchip in the gardens that are around (attached) to the outside of the house and replace with 10mm blue metal, having woodchip close to the house is a recipe for inviting white ants, currently there are no white ants within the block and I would like to keep it that way I'll be buying some large raised garden beds to grow veggies and stuff, and the woodchip will be mulched with everything else that gets dug up, pulled out, or cut down during works Next will some minor drainage and landscaping maintenance up one side of the house, where the fuse box, AC, and solar stuff will go, about 12 mtrs long by 2 meters wide, I'll break up the soil, add gypsum and then I'll dig in a French drains about 300mm deep x 300mm wide and fill it with agg pipe and blue metal, then level out the whole area with a 50mm layer of blue metal, the soil, whilst currently pretty compacted, will break up well with the gypsum to aid in drainage, I'll then cover the area with a 50mm layer of more blue metal In saying this, the drainage issue is minor, but that little hidden away area down the side is untidy and weedy, and as all of the main elec stuff is there I want it neat and tidy to appease my OCD Again, the material excavated from the French drains with be added to the garden bed mulch, as will some rose bushes and some other crap looking garden plants, and a old apricot tree that is looking worse for wear The apricot tree is currently in a little roundish garden bed that is in the middle of the back yard with few other crappy looking plants around it, that will all be removed, levelled, re-turfed, and is a perfect spot for a hills hoist There is also a area about 3m x 2m between the rear fence and shed that will get some attention, it looks like some stuff was stored there and the grass is dead, that will also get broken up and mulched, and is a prime spot for a pumpkin patch I've guestimated that I'll need: 3 tonnes of blue metal, 12 meters of agg pipe, 5kg of Gypsum, and a hills hoist, so a few bags of concrete as well to set it in place (the house currently has one of those pull out 4 line jobs, whilst it works, I want a retro old school hills hoist), I am also going to run some chickens, there's a great spot for a coop, so a chicken coop to suit 4 of those lovely egg laying bitches will also be on the job card That should keep me busy for a while, and will finish off the back yard ready for a early spring planting of some veggies and berries  Once the main effort is done I'll start out the front, there's a large rock garden that could use some TLC, but that is only minor works Should be fully moved in within 2 weeks, the landscaping works will start then Fun times, retirement is good  
    • It happens, that's what your single stage filler is used for.  If it is still visible after the 3 coats of 2k primer, it will be visible after the paint is laid down.  Its hard to give 100% perfect advice without being there in person, I'm very tempted to say stop where you are, fill your pin holes with a single stage putty first then keep going. 
×
×
  • Create New...