Jump to content
SAU Community

Recommended Posts

  • Replies 60
  • Created
  • Last Reply

Top Posters In This Topic

Nope. It's a common misconception. People hear 10k, then tell the next person, etc.

5k will get you a full rebuild with standard parts. 10k is something that will handle 300-400kw+

6-7k is a forged build with oil mods which will handle very decent power.

Unless you're thinking... Jun stroker kit or something... which is like $15k+ all up

Exactly it can be even cheaper if you pull the engine out yourself and you buy the parts that you want to put in it..

Yer true.. but im also looking at it for like ummm speed.. like itll be quicker for us to rip it out and put one back in.... Then to wait to have something rebuilt etc...

If i didnt need a house i wouldnt have worried about the moeny and rebuilt it with new turbos... nearly did it to be honest...

i just rebuilt my RB25 (same prices, parts and labour as 26) with Arias forgies, genuine main and big end bearings, N1 oil pump, new water pump, nismo thermostat, gates belt, cometic gasket, and custom sump. Had block decked, honed and washed, head faced and acid washed, nad crank linished.

It cost me just over 5k, but i put it together myself. It took me a week to do this. By the time the engine gets here from perth you can do a mild rebuild. Pull the motor out one weekend, send crank to get machined/linished, get a set of main and big end bearings, put together following weekend. Drive to work monday, no run in required, $2000 max

i cant see how new bearings (you'll get main and big end for under 400) and a crank linish/machine, would cost more than 2k. if you wanna get rid of the car thats all id be doing. parts total might be 700 or so, assembly might be a few hundred but if you have a mechanic mate shouldnt be an issue

Assembly is around 1500 if you wanted someone to build it for you. If you have a mechanic mate shouldn't bee too much trouble. But like i said, if you just wanna get rid of it, do bearings and fix the crank up, throw a new head gasket in and you're off.

If someone was to put the bottom end together for you and you just fit the headgasket and head i dont see it costing more than 2k, maybe 2.5k.

Like i said, my rebuild cost me over 5k, machining cost me $450, the rest was parts, see what im getting at

was hoping this weekend.. but the guy selling the engine is being a bit slow... Oh and my mechanic has had a hernia op and i cant rush him to soon! so mayb next weekend now grrrr... just dragging on...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



  • Similar Content

  • Latest Posts

    • Yeah since those first 2 replies I actually went and put some 98 in it and tbf it's already doing much better than the 95 (which is weird and makes my inner tinfoil hat wearer think the 95 was a crap batch), getting 8ish around town. Again, wonder if it takes a while to stabilize if the fuel is changed a couple of times. I swear cars used to just either run "well" or "s**t* in my 20s, none of this fuel optimisation business haha 
    • Any number of different ways. Have the coils draw sufficient current to provide contact wetting. Use different contacts in the switch, either by material or design, better suited to the low current drawn by a relay coil. Etc.
    • Hmm, how does the R34 manage to have headlight relays then without getting excessive carbon buildup on the headlight switch contacts?
    • Not R7R. Meant to type R&R, obviously enough.
    • Bugger "making it look stock". I put one conventional internally fused Hella relay behind each globe. I just pulled the plugs off the back of the globes and built new loom segments with male and female plug parts to match up to the original loom and the globe, and used the original power wires to each globe coming from the switch through the original loom plug to trigger the relays. Ran a big fat (also separately fused) power wire across the front of the car to feed all the relays. It's as ugly as f**k, but it is wedged down between the headlight and battery on the RHS and the airbox and headlight on the LHS, and no-one ever looks in my engine bay, and on the odd occasion that they do I simply give no f**ks for what they think. Fully reversible - not that you'd ever want to. For f**k's sake. It's a Skyline. They made million of the bloody things. We've been crashing them into roadside furniture for 30 years now. There is a negative side effect to putting relays on the headlights. The coil current is too little to properly clean the contacts in the switches and they get blacked up and you have to open them up every couple of years and clean them manually. I have 25 years of experience on this point.
×
×
  • Create New...