Yes no doubt there was a stuff up but I wouldnt say its 100% engineers fault. They are contracted/paid to come up with a design that meets the budget of the project. Engineering Dept can show several designs at different costs and risks associated but at the end whoever approved and accepted the risk is at fault.

We dont know.. perhaps at the start of the project they believed the budget was enough to cover. Once you start doing the final design/costing, thats where it adds up and could have blown over budget. With investors promised a return & capital locked, cost would have been cut to squeeze within budget. Most likely the order was given to cut costs, changes were rushed, materials swapped, support beams deleted etc to deliver something which falls close to budget.

If the project manager was guaranteed that it wouldnt fail then I would agree that the Engineering/design team was negligent. If there was a risk, thats where management decide to ask for money or accept the risk...

In the end, its nothing new. Many large ferris wheels built around the world. We know it can be built & material composition, structure & loading isnt complex,

The buck stops with how much money they are willing to spend on building one and whoever thought they can build a ferris wheel for that amount of money in Australia.

Also well aware of IRR, NPV etc when it comes down to capital investment & approval.

Discussion was not tailored towards Chartered Accountants :cheers:

S'all good Pat. Just some friendly banter. At the end of the day we can only speculate. :cheers:

and My ki,

Some manager made the call that we can make a system cheaper than just buying one made.

However after the final details came through, thats where the same manager realised he greatly underquoted.

Nothing to do with Engineering in my opinion. Purely money saving driven, instead of opting for a longer payback period with an existing overseas system.

Don't even bring Gov't Funded stuff into discussion on private enterprise.

They are two ends of the field.

Myki was NOT done with money saving in mind.

Add to the fact Keane/Kamco is American owned... Yet the other tender was MTR...

I mean MTR have the current fking contract! Why would they give it to Kamco to do the ticketing system when MTR have a tried and proven system.

Gov't projects are always under quoted on purpose to snap the contract and then bump costs during it.

However before myki even went live it was something in the order of 60% OVER BUDGET... Since it's gone live, fck knows, it's probably closer to 100% blowout.

It's just absurd bureaucracy at it's best. Do not confuse this for one second with private enterprise. There is nowhere near the abuse that Gov't stuff endures. I mean they even had to go to a probity audit on the tender FFS.

Yes they "ruled" it was fair, but who knows what was really going on.

Yes cause we've all heard of that obscure artist before.

Edit: have one of his songs tagged in Shazam, dammit.

i highly doubt anyone with regular play on nova could be considered obscure ;)

Dubstep is also terrible

this

Guest
This topic is now closed to further replies.



  • Similar Content

  • Latest Posts

    • Welcome Gabriel, and thanks for saving one of the less famous cousins!
    • Wanting to avoid this if possible but kinda looking like I may not have a choice 😭
    • Ok awesome thank you. Just wanted to have them in case I can find some and need to compare part numbers!
    • All I can say Duncan is good luck and I hope that Neil did not run any E85 in Cheryl. I have recently experienced the full spectrum of fuel tank issues in my R33's that had been caused by E85 and contaminated fuel. When you take the cover off the top of the tank and have a look inside you will get an understanding of how easy it will be. Best case situation is clean fuel with minimal contamination. My GTR was like this and it was a very simple operation to just grab the fuel pump carrier bracket and slide it up and out of the tank. My three GTS_T's had different levels of fuel contamination that was probably caused by E85 in the fuel.  In the worst case all of the metal components in the tank had rusted to the point where there were pieces of rusted metal swirling around in the tank. This required the removal of the exhaust, the tailshaft, the complete rear cradle and the fuel tank. The components in the tank were that rusted that it took days to get the fuel pump carrier and the mounting brackets out of the tank. When the tank was finally cleaned, everything inside the tank had to be replaced. With the tank all back together I could then reinstall it in the car along with everything else that had to come out. Good luck and I hope that you find a clean tank.    
    • It is a two door. It is black and also still has the OEM wheels and stereo. Exact model would be KR_R32RGFEL_SS According to GTR-Registry.com is a 2 Door Coupe; RB20DE; 2WD no HICAS; MT.F5; (11L) Projector Headlamps and Fog Lights; (12_) Electronic Active Full Auto Air Con (Climate Control); (13-14SS) V Selection -- Which seems to be accurate description of my variant. Will try to upload a few pictures soon. The OEM wheels look like the below image. Image is taken from the goo-net-exchange website.  
×
×
  • Create New...