Jump to content
SAU Community

Recommended Posts

Ended up spending a WHOLE day yesterday cleaning and rearranging my shed.  Due to the aforementioned disorder, my shed is as cluttered and confused as my brain. Again, because of said disorder,  at any one time there are 5 projects on the go at once and because they're still on the go I don't put everything away so I can "get straight back to it" which rarely happens..

So anyway,  I bought a couple of cheap 2mx2m all steel "pallet racks" to put in my back shed.  The idea is to then take pretty much everything out of the main shed that isn't car related. Most of the garden and building stuff is now booted out to the back shed and onto to the shelves where they belong!

There's still more rearranging and reallocating to do and it's still a bit busy in there but it's a massive improvement on how it was previously. I've discovered floor space I forgot I had... 

For those that have fully dismantled a car before will understand just how much space it takes up!  Particularly panels, bumpers, engine/trans, etc.  I've got stuff hanging on every available wall to get it up off the floor! 

This is not exciting content for a blog but has certainly made the shed feel like a more work ready space now!

  • Like 2
7 hours ago, MBS206 said:

You know the worst thing about acquiring more space for me?

I tend to acquire more things to fill the space...

Generally yes but for some reason I've been ruthless this time around!  I might even need to do another tip run after the way I've finally been able to hit the delete button on shit I've stepped over, stepped around and tripped over for the past 10 years!

  • Like 1
  • 3 weeks later...

I'm pretty much healed up post surgery so I spent another almost full day out in the shed re-arranging everything to make room for all of the shit that I've taken off the car.  I need to get everything off the floor and away from the car for when I start making a massive mess stripping off the remaining body deadener and then for the the painting process.  Almost got the shed to a point now where I feel I can actually start working on the car again (clean shed clean mind or something!).  Almost 11 years of accumulated car parts, building supplies, tools, junk, etc have taken a long time to get in some sort of order again!  Most stuff is now boxed up and in the back shed if it's not car related.  Most people would still be horrified walking into my shed but it's significantly better than it was before!

 

For those that saw my separate post the other day, yeah I ordered one....

This version-

Picture 1 of 12

Picture 5 of 12

Picture 9 of 12

I convinced myself to stop being a clown, wake up to yourself and realise it will take you 5 weeks to make one by which stage you're over working on the car again...  Maybe I am getting on top of my "mental ailments" and making smarter choices....

$1450 delivered which will take my miserable half-dutch arse a few days to get over having spent that much!  If I don't have a use for it straight away after my car is off it I might even see if there is a "rental market" for them.  See if anyone wants to hire it for a period of time.  $25 a week or something like that.  I'll worry about that when my car is actually ready to come off it though as that might be a while away!!

There's now no excuses now for not ending up with an underside you could eat off!

Away for kids sport the next few weekends so hopefully can get the rotisserie assembled ready to go for the car to go straight on it the next available weekend.

 

 

  • Like 1
4 hours ago, Shoota_77 said:

I'm pretty much healed up post surgery so I spent another almost full day out in the shed re-arranging everything to make room for all of the shit that I've taken off the car.  I need to get everything off the floor and away from the car for when I start making a massive mess stripping off the remaining body deadener and then for the the painting process.  Almost got the shed to a point now where I feel I can actually start working on the car again (clean shed clean mind or something!).  Almost 11 years of accumulated car parts, building supplies, tools, junk, etc have taken a long time to get in some sort of order again!  Most stuff is now boxed up and in the back shed if it's not car related.  Most people would still be horrified walking into my shed but it's significantly better than it was before!

 

For those that saw my separate post the other day, yeah I ordered one....

This version-

Picture 1 of 12

Picture 5 of 12

Picture 9 of 12

I convinced myself to stop being a clown, wake up to yourself and realise it will take you 5 weeks to make one by which stage you're over working on the car again...  Maybe I am getting on top of my "mental ailments" and making smarter choices....

$1450 delivered which will take my miserable half-dutch arse a few days to get over having spent that much!  If I don't have a use for it straight away after my car is off it I might even see if there is a "rental market" for them.  See if anyone wants to hire it for a period of time.  $25 a week or something like that.  I'll worry about that when my car is actually ready to come off it though as that might be a while away!!

There's now no excuses now for not ending up with an underside you could eat off!

Away for kids sport the next few weekends so hopefully can get the rotisserie assembled ready to go for the car to go straight on it the next available weekend.

 

 

Probably a smart choice to buy one vs build, purely for the motivation part as you said! Imagine the metal dust everywhere from grinding all the steel to build one. Ha ha ha!

 

Also, post a photo of your garage.

 

Mine is below, this is where I've been cleaning and have already half filled a caged 6*4 trailer. And this is after my cleaning expedition mentioned previously...

The middle normally has a car in it, but I'm dumping things in the middle as I sort through them. And poor skyline was dusty and has had the lightest few drops of rain and now it looks atrocious and needs to be dragged back out and washed thoroughly! And yes to the right is technically another bay, you really can only see 2 bays out of 3 in this picture.

 

PXL_20250201_080326887.jpg

  • Like 1

@MBS206 thats pretty neat and tidy to me! 

I'll get a photo of mine when I'm out there next. It might require multiple photos to understand the scale of the atrocities though...

In total I have 4 sheds of varying sizes and layouts. Main shed is 14x8, second shed is 3x8, third shed is 11x2.5, fourth shed is around 6x4.  All are pretty much full.  

The main goal of my cleaning tsunami is to make the main shed predominantly car and motorbikes only. Second shed is my metal fab room (2 x bench grinders, drill press, bench belt sander, metal band saw, scrap metal storage and some of my garden tools.  3rd shed is more bigger garden stuff, storage for engine crane, jack stands, concrete grinder, concrete mixer, air compressor lives there, and it now has two 2mx2m pallet racking shelves with itemised boxes holding building stuff, electrical stuff, plumbing stuff, etc, etc.  The 4th shed is Ryobi electric ride on mower, mini boom sprayer, ancient Kubota tractor, more garden stuff!  I have got a lot of shit....  Then there's the pool house (8mx4m) and the pool pump shed (4mx4m).  I built all of the sheds over the 11 years we've been here.  The main shed was a Ranbuild kit, the rest are all custom made to fit the areas available. Building the main shed taught me a LOT as I had no idea about building anything prior to that!  I've still got one more in me. It will be my man cave which I poured the extra concrete for way back when I poured the concrete for the main shed. The idea is the Skyline will be a centre piece of the main cave once (if...) it's finished. 

I told my now 14 year old son yesterday that I will 100% drive him to his year 10 formal in 2 years. Still a long way off but at least I now have a date to work towards! 🤣

  • Like 1
2 hours ago, Shoota_77 said:

@MBS206 thats pretty neat and tidy to me! 

I'll get a photo of mine when I'm out there next. It might require multiple photos to understand the scale of the atrocities though...

In total I have 4 sheds of varying sizes and layouts. Main shed is 14x8, second shed is 3x8, third shed is 11x2.5, fourth shed is around 6x4.  All are pretty much full.  

The main goal of my cleaning tsunami is to make the main shed predominantly car and motorbikes only. Second shed is my metal fab room (2 x bench grinders, drill press, bench belt sander, metal band saw, scrap metal storage and some of my garden tools.  3rd shed is more bigger garden stuff, storage for engine crane, jack stands, concrete grinder, concrete mixer, air compressor lives there, and it now has two 2mx2m pallet racking shelves with itemised boxes holding building stuff, electrical stuff, plumbing stuff, etc, etc.  The 4th shed is Ryobi electric ride on mower, mini boom sprayer, ancient Kubota tractor, more garden stuff!  I have got a lot of shit....  Then there's the pool house (8mx4m) and the pool pump shed (4mx4m).  I built all of the sheds over the 11 years we've been here.  The main shed was a Ranbuild kit, the rest are all custom made to fit the areas available. Building the main shed taught me a LOT as I had no idea about building anything prior to that!  I've still got one more in me. It will be my man cave which I poured the extra concrete for way back when I poured the concrete for the main shed. The idea is the Skyline will be a centre piece of the main cave once (if...) it's finished. 

I told my now 14 year old son yesterday that I will 100% drive him to his year 10 formal in 2 years. Still a long way off but at least I now have a date to work towards! 🤣

It only looks tidy, as most of the stuff that was on the whole back wall, is now in the trailer to go to the tip, or has been shoved in my 2.2x2.4m "Spare parts room", and now I can't get to anything in there :/ Ha ha ha

I could definitely do with a bit more space, but I'd just end up with your problems :P

I'm going to enclose the car port beside the garage, and move a lot of stuff into it I think. OR... It will be setup as a fabrication area, and the main garage will have parts storage in it. I'm not sure yet...

Need some pictures of that big shed you've got with the bikes and Skyline in :D

8 hours ago, MBS206 said:

It only looks tidy, as most of the stuff that was on the whole back wall, is now in the trailer to go to the tip, or has been shoved in my 2.2x2.4m "Spare parts room", and now I can't get to anything in there :/ Ha ha ha

I could definitely do with a bit more space, but I'd just end up with your problems :P

I'm going to enclose the car port beside the garage, and move a lot of stuff into it I think. OR... It will be setup as a fabrication area, and the main garage will have parts storage in it. I'm not sure yet...

Need some pictures of that big shed you've got with the bikes and Skyline in :D

I definitely do recommend having a fab/grinding/dirty shed or area to keep all that grinding dust out of your main shed.  But you're right, it doesn't matter how much room you have you still end up filling it!

I might even do a short video which will make it easier to fully take in the horrors of what I've created...

  • Thanks 1

Couldn't help myself, had to start putting it together....

20250206_213744.thumb.jpg.a8656aeb62a0832f294a1280cf8feeff.jpg

20250206_213758.thumb.jpg.cfb58af634e8bbf19062f5cca31e7d75.jpg

It really is a solid bit of kit.  Probably stronger than i would have made it myself to be fair! 🤣🤣

Sweating like a pig after that.  Bloody hot and muggy day today, time for a swim now!

  • Like 1

Rotisserie is fully assembled apart from centre connector which obviously isn't required until the car is on it. It packs away fairly neatly and doesn't take up too much room. (Now that I actually have some room after my clean up!)

20250207_172456.thumb.jpg.f0223c7e400af9b686ce04bc8c6e33ef.jpg

20250207_172501.thumb.jpg.57708a47d111a3b7ee1e22544ac56707.jpg

Overall very happy with the quality of it.  Assembly was a piece of piss.  The only thing I didn't like was that the pins that lock the rotation lock wheels in place were a bit of a dick in a bucket scenario. It allowed the arms to rotate a significant amount even when locked in place. 

To fix that i measured up the hole and went and grabbed a couple of 18mm fully threaded bolts and a thread tap to suit. I ran the tap through top and bottom so it was threaded both ends.  Then just threaded the bolt through both sides.  It has made a massive difference which hopefully you can tell in the before and after video how much difference it made.

 

Hopefully back working on the car over the next few weeks.  

20250207_161253.jpg

35 minutes ago, MBS206 said:

It looks like it needs a big worm gear drive on it to control the rotating, not a few sloppy pins!

You can get them with the worm drive rotator but I was too tight to pay another $250-$300 so manual labour it is! I don't think it will be too hard to rotate though. 

5 minutes ago, Shoota_77 said:

You can get them with the worm drive rotator but I was too tight to pay another $250-$300 so manual labour it is! I don't think it will be too hard to rotate though. 

I was more thinking so it doesn't flop around as much rather than for rotating it.

Once you have the balance right, it should rotate well enough, depending on how much resistance there is on the pivot. I think you said the pivot point was on a bearing though didn't you?

  • Like 1
2 hours ago, MBS206 said:

I was more thinking so it doesn't flop around as much rather than for rotating it.

Once you have the balance right, it should rotate well enough, depending on how much resistance there is on the pivot. I think you said the pivot point was on a bearing though didn't you?

Nah no bearings, just slip fit.  Would be a reasonably challenging but not impossible job to modify it to run bearings but I'm hoping that's not necessary as I may have well built one myself if I end up spending hours modifying it!

  • Like 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



  • Similar Content

  • Latest Posts

    • Nah no bearings, just slip fit.  Would be a reasonably challenging but not impossible job to modify it to run bearings but I'm hoping that's not necessary as I may have well built one myself if I end up spending hours modifying it!
    • Brumbys with good shells are bloody expensive, I've looked at 2 "cheaper" cars, and walked away from both,  plus after some research spare parts are fairly sparce I'm starting to think that I missed the boat on finding a clean one that is straight (ish) and without alot rust I'm starting to think about a old Hilux as panels and other parts are much more available as they sold tens of thousands of them I use to be indecisive but now I'm not sure
    • A Brumby would probably fit a big metal toolbox in the back... this is how it begins  
    • Picked up a new OEM boot seal for the MX5 today as the old one got ripped a bit by me being a idiot by seeing if I could fit a large metal tool box in it, it didn't fit, and ripped the seal with the corner of the tool box I am still waiting on time to get the cams and new balancer installed, as well as the repairs to the boot Time will not be an issue soon though
    • I was more thinking so it doesn't flop around as much rather than for rotating it. Once you have the balance right, it should rotate well enough, depending on how much resistance there is on the pivot. I think you said the pivot point was on a bearing though didn't you?
×
×
  • Create New...