Jump to content
SAU Community

Recommended Posts

I'm currently get my rb26 head ported and my engine builder wanted me to buy an old head to cut up to see how big the ports are and where the water jackets are so he doesn't get close when porting it, now I thought they might be some good pictures for you to have a look at, I'm not sure weather it's been posted up before but here they are. Cheers


post-134876-14173179977791_thumb.jpgpost-134876-14173180239238_thumb.jpgpost-134876-14173180418_thumb.jpgpost-134876-14173180656213_thumb.jpg

  • Like 6
Link to comment
https://www.sau.com.au/forums/topic/451224-head-porting-for-rb26/
Share on other sites

Get some of the divider in the exhaust port if you can please, there is a jacket that goes through the middle in there, you can see a tiny hole from the head gasket side going through the middle of it.

Also some pics of the sides of the ports to see the design on thickness of the water jacket areas on the sides.

Or in other words cuts made the other way......

Lucky you, i tried to find a cracked or damaged head locally to cut up but everyone wanted top $ for something only worth its weight in alloy.

Cyl 5 95% done on the exhaust side, others are roughed in, looking to buy a bigger house so house hunting ATM and the head work can wait till i find time and energy between that and running a business.

Took me 8-10 hours of touching and looking one exhaust port to bring it where i wanted it to, now will be replicating it across the other 5.

No worries GTRPSI I'll see what I can do for the other way to cut it up I have a couple more of the head cut up so I'll get more and post them up, might be in a day or too tho when I get back out to the workshop

  • Like 1

Dont stress or rush as ive already worked out my shape on the head im using, however the information would be good for others and my other backup head i have for future work.

Thanks for taking the time to share the info, its these things that help everyone.

  • 7 months later...

Well I'm about to cut them bits up you asked for gtrpsi as I'm about to start porting the head soon, I finished my porting on the bit that's attached to the head a while ago, took about 10 hours to complete, a question for people who are experienced in head porting what kind of finish do you use? I'm using 80 grit on a little die grinder flapper disc, here's a few pics of how it looks,

post-134876-14380559867033_thumb.jpg

Port matching to my hypertune runners

Tpost-134876-14380560597783_thumb.jpg

The left is standard the right is my job

post-134876-14380561672914_thumb.jpg

  • Like 1

You'd be the coolest buy ever if you could get some fine graph paper and trace/etch out the shape to some sort of scale. You know, the indiana jones trick with the charcoal on top of the paper on top of the head. It would give everyone solid dimensions of the ports and resultant thickness.

Also the full half-cut of the eshaust port would be great as well.

Ill get some pics and better still measurements of my Drag head tonight or tomorrow to share, ive only completed the exhaust ports to satisfaction, inlets are partially roughed out, still studying them and not enough hours in the day.

Measurements might be better at certain points in the ports so you can see how far it can be taken...remember the exhaust ports are the major restriction, inlets dont need that much work.

My exhaust port shape was based on carefully measuring 2 heads i was granted access to, one was made for a 1200Hp RB build by a local porter, the other was a Sydney port job for a all out drag engine that was also at the workshop.

Ive got their inlet specs, however im yet to overlay what they did and study them properly.

Dont ask me how many hours went into the exhaust ports.......

And dont forget, outright drag specs wont work well on the street as flow velocity will be low, however its a indication of how much room there is to work with safely.

Edit; to answer your port finish question, leave the intakes rough, 80 to 120 grit to help atomize the fuel, exhausts can be the same for the street, ive gone for polished exhaust ports, not needed on a street engine though as they will be carbon coated quickly.

Edited by GTRPSI

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • I swear at my GKTech ones every time I have to take them apart and replace a spherical. But I wouldn't swap them for anything else. They absolutely slay every other option, at least in terms of how they actually work. You sure you don't want to live with bearings? I mean, they don't have "ball bearings". They are rod ends and sphericals throughout. Tough as nuts, even though I have found more than one way to wear them out.
    • From when I was looking at getting the 86 engineered for the turbo, the joint said to put in a few euro 5 or 6 cats, then tune the car on a nice clean E85 tune When I was looking at a turbo for the MX5, it was basically the same thing, a couple of cats and a nice clean tune Although, it will depend on the year of the Jeep IRT emmisions standards required, and what mods are done, especially if it has a newer engine installed that requires a higher Euro
    • Yeah - but it's not actually that easy. There are limits for HC, CO, NOx and particulates. Particulates shouldn't be a concern in any petrol engine unless trying to comply to the very latest Euro standard. But getting a tune right so that all the others stay within limits AT THE SAME TIME is not a trivial exercise. You couldn't possibly get it right by just guessing at the tuner's dyno, unless he had a 4 gas analyser up the pipe, which is not often the case these days. It used to be. Every decent shop that did "tune ups" (as opposed to tuning) would have a 4 gas analsyer. Perhaps there's still quite a few of them around these days. But most "tuners" are only watching O2 and power readings.
    • Slight segway but the most expensive part of the whole thing which I would have thought would only be required for an engine size/type swap, not a VIV test, is emissions testing.  That's when you get into the big bucks.  I can't remember the exact price now but I got quotes for the GT-R based on swapping to RB30 (not that anyone bothers doing it legally anymore...) and it was around $4500 just for that alone.  The guy that does them manipulates the tune on the vehicle to make sure it passes.  The cheaper option is to book into Kangan Batman Tafe (I think that's where it was) and hire their tester.  Allegedly you're not allowed in there with the car though so not in a position to tweak anything to make sure the vehicle passes.  I'm sure in this day and age of ultra tuneable ECU's you could get the tuner to program a special efficiency (clean) tune that emits the lowest amount of particulates possible that would pass the test.  It might only make 50kW's but as long as it passed who cares!
    • I'm sure he has left signs, or, he is looking down, laughing That's my cunning plan for when I leave, lots of half finished projects, with no rhyme or reason of where I was actually up to, just to keep everyone on their toes
×
×
  • Create New...