Jump to content
SAU Community

Recommended Posts

I dont think my battery even weighs like a kilo it's tiny, may as well be one of those little 9v batteries

You'd be surprised.

Thought my R1 battery was small but it was 4.5kg - saved nearly 4kg by using lithium. That's a lot of unsprung weight on a bike. People pay thousands for that kind of weight saving.

Phillip Island in a few weeks should be goooood I wonder what speed I'll get down the straight..

lol keep ya head down

Phillip island straight on a naked = gonna have a bad time

Why does it have anything to with the government? NBN has been a clusterf**k for a few years now. Visionstream were a primary contractor and had sack a lot of staff to reduce overheads from NBN playing hardball. Like many government backed initiatives, the cheapest bidder is selected, the price blows out due to poor estimations and general incompetence.

Whoever is in government at the time has little affect on this process.

The article I mean. Essentially blaming the government for changing the scope of the NBN and then blaming them when the project was within budget during Labour reign and now blowing out during liberal reign.

I think it works both ways

It's not beyond governments to put in measures of control for budgeting, but there are also variables you can't account for. And if delegations and contractors were lined up during a previous reign of government that's a bit difficult to control.

Forecasting an enormous project with so many variables is also very hard. I don't mind it blowing out within good reason, but when it's clear that private contractors are rorting or being rorted, that's when I feel not enough measures have been put in place or enough control exercised by governments. The insulation scheme, for example, should have been much better regulated than cheques written and contractors left to their own devices.

so want to stab some-one for that...all this money to guarentee slower internet than most of us get now.

Why does it have anything to with the government? NBN has been a clusterf**k for a few years now. Visionstream were a primary contractor and had sack a lot of staff to reduce overheads from NBN playing hardball. Like many government backed initiatives, the cheapest bidder is selected, the price blows out due to poor estimations and general incompetence.

Whoever is in government at the time has little affect on this process.

how does it have anything to do with the gov..idiots decided to drop grom 100mbit to 25..

So spending a shit tonne of cash for the internet most of us already had/or faster.

they should have kept the original expandable system Labour had or cancelled it..which would be a better option as they cannot innovate like private business trying to clear a profit would.

^this

It's a LOT of money to drop on effectively obsolete technology.

Even if the labor model was more expensive it was the better option. This LNP clusterf**k will cost another $50 bil in a few short years when the whole thing needs to be replaced

What are you all crying about? The article clearly states that any additional funds will be raised from private investors & not government.

So relax, your precious tax income isnt being spent.

Also if you read the article instead of shouting that the sky is falling, it says:

"While 20 per cent of premises will get fibre connections, 38 per cent will get fibre to the node and 34 per cent will access the NBN using the hybrid fibre coaxial cables that supply Foxtel services."

HFC connections offer gigabit speeds & not the doomsday 25mbps.

f**k me, everyone has turned into a telecommunications engineer/capital coordinator.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now



  • Similar Content

  • Latest Posts

    • You know, that is exactly the thing that I was thinking a coupe of hours ago. I even had a plan for a meme, involving one big one, another big one, and the Old El Paso girl saying "¿por que no los dos?"
    • NoS, 2 of the big ones.
    • Oh, that's grim. Something bad has been happening there.
    • Put an endoscope down the hole and saw this. Not quite all around the bore but a good 60% at least. Chin to the chest and towards further disappointments I guess.
    • 2 does "sort of" applies, maybe......but looking at what parts would be needed for the swap to get engineered, registered, and insured, and basically that's everything under the car, the modifications the make it legal would be problematic and horrendously expensive, all for a street car that just cruises around and hits a few twisty roads on the weekends Also, from looking at the NSW rules and Regs, with all modifications that is required just to make the car safe and not twist itself to pieces, and then actually get registered for street use, may still be impossible nowadays As for 1, when you add in a fresh engine, fresh transmission, rear cradle and diff, tailshaft, suspension, brakes, cooling, and all the other fabrication required, your probably looking at up to $100k to do it right, all for a 20 year old MX5 that is over engineered and you would never be able to actually use the power it has on the street, much like your beastie, which I love, but you actually track that thing and can use all of its powers in anger, in a safe environment  Hell, the old Bogan Cruise Ship had more power than I could use on the street, and in hindsight, I went a bit silly on that thing, it didn't really need the 500hp it had for what I actually used the car for, it was fun, but basically unusable on the street if you value your licence  As for cams, yeah, I'll probably book it in for them to get installed and tuned soonish, like next month after MX5 Mania are back at work....... and yes, I've already sent a email to bin the turbo quote and quote instead to install cams and a new Fluidampr balancer that will suit the 2.5 better than the OEM 2.0 balancer that is swapped over for the 2.5 install, as the balancer needs to get pulled to time the cams it's a while your in there sort of thing I did think a bit about flex fuel for a laugh, but being na, and no where really around locally anymore to get E85, I've binned that idea, so no sweet sweet corn smells are set for the car I wish E85 was more of a standard fuel, it's better for the environment, better for tuning, plus that sweet sweet smell we all love As for fitting in the family, that's not needed, as everyone in the family already owns a car that can seat 5 humans comfortably enough, the MX5 is "my toy" As for buying a car that is already built, nah, I would rather pick and choose my parts, I enjoy the process, and in the big picture, the additional cost is well worth the enjoyment, and the occasional frustration, I get out of doing it, albeit with other people spinning the spanners, and me, just paying the invoice 🤣
×
×
  • Create New...