Jump to content
SAU Community

Recommended Posts

So I obviously gave up on the MINE'S ECU & have started down the Haltech route.

Here is a link to the start of the install & pics of the parts I chose from reading this forum & from member suggestions...

Including

RACEWORKS 725cc injectors

Haltech Platinum Pro plug and play

Boost solenoid

Walbro 255 fuel pump

Adjustable cam gears OS GIKEN

Tomei PonCam ProCam upgraded cam shafts

in 260 9.15

out 260 9.15

Rocker cover gasket kit

Autech catch can

Air intake mod

100k service kit including Timing belt

Water pump

ITS DYNO TIME...

So will be about this weeks progress & the outcome.

  • Like 1
Link to comment
https://www.sau.com.au/forums/topic/465091-stagea-260rs-autech-haltech-upgrade/
Share on other sites

Well all done & I'm more than happy from 164KW to 297KW atw

On Dyno

DYNO graph

And as a bonus it has a great lumpy idle with the new cams

Idle

During the process Jezz found not one but three exhaust restrictors one before the CAT & both mufflers

Restrictors

Cant wait to pick her up...

  • Like 2

Does anyone know if Yu can get badges made? I would like a badge to go on the front grill on the space left for the Autech Version badge as it's the only spot that looks like something is missing. Any thought or suggestions?

  • 2 weeks later...

Well been driving the car for 2 weeks now & it is a different beast, it is pure driving pleasure the power the sound it's fantastic.

I can't recommend DVS TUNING in Somersby enough, Jezz knows the RB's inside out and is a whiz on Haltech ecu's

He stuck to the quote & it was done on time. I'll be back when it's time to build a second monter motor to drop in the Stagea.

I've done a few more small mod & tidy up jobs since the tune...

Replaced the soft rubber seal around the air intake that seals against the bonnet.

Removed tidied up & spay painted the acoustic dampener under the bonnet with matt black calliper paint.

Added a huge deep cycle second battery in the back with a 800watt inverter with a RedArc smart controller system for charging camera, gimble, & drone batteries between jobs.

And I'm in the process of ordering Project Mu NS4000 brake pares front & rear as the one that the car came with must be track pads. I can't even get the abs to trigger no matter what when the are at normal temp & they have left hot spot deposits on the Nismo rotors I'll have to get skimmed off.

Well all done & I'm more than happy from 164KW to 297KW atw

And as a bonus it has a great lumpy idle with the new cams

During the process Jezz found not one but three exhaust restrictors one before the CAT & both mufflers

Cant wait to pick her up...

Jezz worked out that with every exhaust restrictor he removed I gained about 25KW so all up about 75KW AWESOME!

  • 1 month later...
  • 1 month later...
On 31/07/2016 at 7:23 PM, flavzz said:

Great result mate, very clean looking 260. Any plans to take it to the track/strip?

Not at the moment it is just too pristine of a specimen to bash around its like driving a brand new car.

  • Like 1
  • 1 month later...

Project Mu pads fitted & make a huge difference & no dust much better braking but still needs attention maybe the rotors skimmed & the system bleed with fresh dot5 fluid. I also found a genuine instrument cluster from Montreal Canada that has turned up so my tachometer reads correctly. I'll be fitting that this week with a fresh set of super white led globes. Awesome find, now I won't have the blacked out auto trans lights.



I found a genuine front grille Autech Version badge. Looks great but expensive but it was a blank area that looked like it needed a badge. I also added some cheap nismo badges front and rear as sacrificial offerings to keep the idiots away from the genuine ones.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • It's unfortunate what Tomei USA has done to Tomei's name in general. I'm very weary of ordering parts from them now. I only order direct from a Japanse source (e.g Nengun). At least their logos are different, so you end up knowing what you have. 
    • Update Issues 5 (plus #4) - 10 After making a claim about issue #4's missing part, DeAgostini Japan sent a whole new issue #4 and it arrived about 2 weeks after that. That was back in early March. It took another 4 weeks to receive issues 5 - 13 though. This update is for issues 5 - 10. Ove the 5 issues the front left suspension and most of the engine have been completed. The quality of the castings and fit of the parts is quite good, it seems better than DeAgostini's BNR34 Skyline GT-R from the Fast & Furious 2 movie, which (to me anyway) doesn't seem to have as tight tolerances or quite as accurate castings.  Each issue has a lot of info about the 1989 - 1993 Skyline range and other Nissan models from that era, but the focus is on the BNR32 Skyline GT-R Nismo and the various racing it did in Japan, Europe (Spa 24hrs) and of course Australia. I've included some text translated with Google Lens in some photos and will add to them if there's anything worth including. 
    • If it's for a SR20, make sure it's not the American Poncams, might as well call them Poocams. Had a set in a friend's car, all scuffed up after a few track days. Like the metallurgy Tomei USA used is junk. Went back to JDM OG Tomei Poncams, no issues till now.   Tomei USA is not the real OG Tomei.   Random rant over, fk the US of A, bunch of c u n t s. 
    • Most of the industry in North America either runs on Siemens or Allen Bradley. I have two redundant S7-1500's on my desk right next to me for simulation. Siemens has been losing ground though since Stuxnet, as cybersecurity is a big thing. In my line of work that is federally regulated, you must by law have a cybersecurity management program in place and its audited and inspected every so often.  I work with Emerson PLC's daily (RX3i's) and have done large biogas/refinery projects with their DCS's. Their PLC's are somewhat OK minus the way they do PLC redundancy (You have to download on both PLC's separately every time you make a change )  As for their DCS's... you'll be limited financially first before anything else stops you. Costs are exorbiant at roughly 10x what it would cost you to do with any other system (e.g AB PAC).  1990's, those suckers are brand new haha! Kraft-Heinz (An old client when I use to work for an ESP) still runs Siemens TI505 PLC's from the mid 80's. Ohh how I don't miss working with those... you could only do a certain number of online downloads until it's "Change" buffer would be full and you would then need to go offline to do a full download. There was no warning of when this was coming up and it generally would happen when you would go in at 2am to make changes before production -_-.     
×
×
  • Create New...