Jump to content
SAU Community

Recommended Posts

Hi All,

Thinking of getting into the drift scene with an R31 however I have searched the forums and come to no definite conclusion about RB20DET/ET vs RB30ET. Would it be better to buy an RB20DET/ET skyline or turbo an RB30E? I understand at the end of the day not project car is ever cheap in the long run but I'm trying to go for the most budget friendly option. 

Cheers.

RB30/25  will be miles better. You can do it on the "cheap" stock everything except rings, bearings and small end bolts but it will still cost for the twin cam head, ecu and the other bits and pieces.

  • Like 1
6 hours ago, KiwiRS4T said:

RB30/25  will be miles better. You can do it on the "cheap" stock everything except rings, bearings and small end bolts but it will still cost for the twin cam head, ecu and the other bits and pieces.

Cheers man, what would you estimate the total cost for parts roughly? 

Edited by Anthony1016

Really hard to say as many parts will be second hand so may vary according to your luck. If you can pick up a going RB25DET for $1 500 that could be the way to go. Then you will need a FMIC, figure out a way to tune it (could cost 2k alone) better injectors and fuel pump, the aforementioned rings, bearings and small end bolts, better clutch...assuming no labour except for the tuning you are at $5k at least. Try not to spend any money on non essentials like FF Plenums or aftermarket exhaust manifolds etc

  • Like 1
3 hours ago, Griffin said:

Where are you located? I've got an rb25det neo engine, manifolds and bits and pieces at Newcastle if interested in having a look.

I'm in Sydney but willing to drive for parts, how much were you looking for? 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • I just got to work and skimmed through 61508 and 61511. I was surprised the CSA adopted both, but neither are enforced. To recap what I read, it states that in a perfect world, they should be segregated but they acknowledge that this is not industry standard and clearly mention that they allow mixing of safety and non-safety. 61511 also mentions software segregation like AB does in their safety PLC's.   Now if only I could go back to control, let alone safety over comms. In my current line of work, we're only allowed monitoring and basic control over comms. Everything critical must still be hard wired as much as possible. 
    • I've unfortunately never been as they're on the complete other side of the continent and another country that isn't currently letting us in as easily as they use to. I even heard their stop signs over there actually say "Stop" instead of "Arret". If I decided to trek the 48h drive, I wouldn't know when or where to stop haha. Whenever I order parts from UP Garage, I order from Japan as it's cheaper. Same with GKTech... oddly enough, it's cheaper shipped from Australia then it is the US.  UP Garage Japan operates their US leg though, unlike Tomei. If Tomei JPN had the power to close down Tomei USA, I'm sure it would be done in a day. They're two completely separate entities. Tomei JPN messed up somewhere originally agreeing to its creation and got sacked big time. 
    • I asked someone about this and he told me about the Audi 1.8T engine. But I think it would be difficult to swap
    • I don't know that machine specifically, but I'd personally go for something with a little more kick than 130amp. Around up to 180 would be good. At the 6mm range, you're really pushing the machine hard and don't have a long period you can run for with out needing to give it a rest. Lots of MIG machines come with a regulator and hose. A lot will come with a starter roll of wire too, but it isn't too expensive to buy. I'd recommend NOT buying a massive roll too, as you don't want it sitting around FOREVER in the machine between uses and potentially going to shit. For thin sheet metal, get a roll of 0.6mm if you're doing over 3mm and above, switch over to 0.8mm wire. Even by 2mm you'd probably really want to switch. As for gas battle, it's all swap and go style now. You'll pay a bottle deposit, and then X amount to swap for a full one. I think it's like $200 or $300 for a D Size bottle upfront as "deposit", and like $110 to $150 per swap. My D size CO2/argon bottle lasts a fair bit of welding on the MIG. And I run an E size bottle on the TIG. For DIY MIG, stick with a D size bottle. If you really start to get into a LOT of welding and doing it really regularly, then upgrade. If you're like most DIY car guys, one D bottle will last you 2 or 3 years easily. I think I've been on my current bottle about 5 years. It is starting to get low, but I've been smashing it a lot more the last 6 months.
    • SR20s came with cars like the Bluebird and Primera, but the RB20 never came. The ones in Turkey were either brought in specially or from abroad. That's why RBs aren't as common as SRs. And if a part breaks or I need to replace it when doing maintenance, it's harder to find parts for RBs.
×
×
  • Create New...