Jump to content
SAU Community

Recommended Posts

You could also try RHEMAC MOTORS in Gawler,they have had many years exp with all types of engine maching (most workshops around adel have their m'cing done by RHEMAC!) they have state of the art workshop and are very professional in all they do!Give DES a ring and see what he can do for ya..

Regards,

SKYLINE (Kym)... B)

Link to comment
https://www.sau.com.au/forums/topic/94363-rb25det-rebuild/#findComment-1704270
Share on other sites

hi, i recently had my RB25 rebuilt at boostworx, they organised all the parts, machining ect for me. i would recommend them.

Sambo33,

If you don't mind me asking, how much did it cost you all up and what was done? U can PM me if u like.

Link to comment
https://www.sau.com.au/forums/topic/94363-rb25det-rebuild/#findComment-1705321
Share on other sites

I'm having a good experience with allen engineering, they have given me some great advice - and really know what they are doing.

The best thing is they were one of the cheaper quotes I'd gotten, and they are a proper engineers, not just a mechanic who does a wheel alignment and a spark plug change in the morning and bolts a few engines together in the afternoon. :)

The only thing that may put you off is the fact they are out in mallala (45min drive from the city) - and you probably wont be able to leave your car there (i just dropped the engine parts off).

Link to comment
https://www.sau.com.au/forums/topic/94363-rb25det-rebuild/#findComment-1705866
Share on other sites

One of the guys I know got his SR20 rebuilt by Nisspeed. Might be worth checking them out...

I think you'll find Boostwork simply use Nisspeed for engine rebuilds. Nisspeed have done alot of RB25DETs over the years......not mine .....yet :(

Link to comment
https://www.sau.com.au/forums/topic/94363-rb25det-rebuild/#findComment-1707304
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Similar Content

  • Latest Posts

    • I just got to work and skimmed through 61508 and 61511. I was surprised the CSA adopted both, but neither are enforced. To recap what I read, it states that in a perfect world, they should be segregated but they acknowledge that this is not industry standard and clearly mention that they allow mixing of safety and non-safety. 61511 also mentions software segregation like AB does in their safety PLC's.   Now if only I could go back to control, let alone safety over comms. In my current line of work, we're only allowed monitoring over comms. Everything critical must still be hard wired.
    • I've unfortunately never been as they're on the complete other side of the continent and another country that isn't currently letting us in as easily as they use to. I even heard their stop signs over there actually say "Stop" instead of "Arret". If I decided to trek the 48h drive, I wouldn't know when or where to stop haha. Whenever I order parts from UP Garage, I order from Japan as it's cheaper. Same with GKTech... oddly enough, it's cheaper shipped from Australia then it is the US.  UP Garage Japan operates their US leg though, unlike Tomei. If Tomei JPN had the power to close down Tomei USA, I'm sure it would be done in a day. They're two completely separate entities. Tomei JPN messed up somewhere originally agreeing to its creation and got sacked big time. 
    • I asked someone about this and he told me about the Audi 1.8T engine. But I think it would be difficult to swap
    • I don't know that machine specifically, but I'd personally go for something with a little more kick than 130amp. Around up to 180 would be good. At the 6mm range, you're really pushing the machine hard and don't have a long period you can run for with out needing to give it a rest. Lots of MIG machines come with a regulator and hose. A lot will come with a starter roll of wire too, but it isn't too expensive to buy. I'd recommend NOT buying a massive roll too, as you don't want it sitting around FOREVER in the machine between uses and potentially going to shit. For thin sheet metal, get a roll of 0.6mm if you're doing over 3mm and above, switch over to 0.8mm wire. Even by 2mm you'd probably really want to switch. As for gas battle, it's all swap and go style now. You'll pay a bottle deposit, and then X amount to swap for a full one. I think it's like $200 or $300 for a D Size bottle upfront as "deposit", and like $110 to $150 per swap. My D size CO2/argon bottle lasts a fair bit of welding on the MIG. And I run an E size bottle on the TIG. For DIY MIG, stick with a D size bottle. If you really start to get into a LOT of welding and doing it really regularly, then upgrade. If you're like most DIY car guys, one D bottle will last you 2 or 3 years easily. I think I've been on my current bottle about 5 years. It is starting to get low, but I've been smashing it a lot more the last 6 months.
    • SR20s came with cars like the Bluebird and Primera, but the RB20 never came. The ones in Turkey were either brought in specially or from abroad. That's why RBs aren't as common as SRs. And if a part breaks or I need to replace it when doing maintenance, it's harder to find parts for RBs.
×
×
  • Create New...